###
DOI:
电力大数据:2019,22(10):-
←前一篇   |   后一篇→
本文二维码信息
基于多时段机组组合的中长期市场安全校核方法
梁振成1, 卢纯颢1, 王刚1, 张德亮2, 黄红伟2, 游成彬2
(1.广西电网电力调度控制中心;2.北京清大科越股份有限公司)
Long and Medium-Term Power Market Security Check Method Based on Multi-Period Unit Commitment
LIANG Zhencheng1, LU Chunhao1, WANG Gang1, ZHANG Deliang2, HUANG Hongwei2, YOU Chengbin2
(1.Guangxi Power Grid Power Dispatching Center;2.Beijing Qingda Keyue Co,Ltd)
摘要
图/表
参考文献
相似文献
本文已被:浏览 571次   下载 782
投稿时间:2019-06-03    修订日期:2019-06-24
中文摘要: 为解决电力中长期市场中调度机构安全校核缺乏有效技术方法的问题,基于多时段机组组合模型提出了一种面向电力中长期市场的安全校核方法。以发电企业中长期校核电量偏差最小化为优化目标,综合考虑电力平衡约束、网络传输能力约束、机组发电能力约束等多方面系统运行约束条件,构建了电力中长期市场机组组合模型。利用该机组组合模型,对电网调度过程进行运行模拟。并通过判定各发电企业电力中长期交易结果的完成率偏差,来判定电力中长期市场交易结果是否满足系统运行要求。最后,基于某省区电网实际数据构造的算例表明,与传统典型日运行模拟校核方法相比,本文所提出的校核方法能有效考虑机组启停时间约束等运行要求,更符合电网实际调度运行需要,能够给出更为准确的安全校核判定结果。
Abstract:In order to solve the problem of lack of effective technical method for the long and medium-term power market security check for dispatching center, a security check method for long and medium-term power market based on multi-period unit commitment model is proposed. The long and medium-term market unit commitment model is constructed to minimize the electric quantity completion rate deviation of power generation enterprises in long and medium-term power market, which takes the power balance constraint, network transmission capacity constraint, unit generation capacity constraint and other system operating constraints into consideration. Based on this model, the operation simulation of power network dispatching process is carried out. It could be determined whether the long and medium-term power market trading results meet the system operation requirements, by determining the deviation of the completion rate of the long and medium-term power trading results of each power generation enterprise. Finally, a case study based on the actual data in a certain provincial power grid shows that, compared with the traditional typical daily operation simulation checking method, the proposed checking method can effectively consider the operating requirements such as the unit start-stop time constraint, which is more suitable for the actual dispatching operation needs of power network and can give more accurate safety checking results.
文章编号:     中图分类号:TM732    文献标志码:
基金项目:
引用文本: