一起220kV组合电器绝缘击穿故障原因及分析
马凯,刘流,黄道均,束畅,高燃,苏文,章书剑
(国网安徽省电力有限公司检修分公司,国网安徽省电力有限公司建设分公司,国网安徽省电力有限公司检修分公司,国网安徽省电力有限公司检修分公司,国网安徽省电力有限公司检修分公司,国网安徽省电力有限公司检修分公司,国网安徽省电力有限公司合肥供电公司)
Cause and Analysis of Insulation Breakdown Fault of a 220kV Gas Insulated Switchgear
MA Kai,LIU Liu,HUANG Daojun,SHU Chang,GAO Ran,SU Wen and ZHANG Shujian
(State Grid Anhui Maintenrance Company,State Grid Anhui Construction Company,State Grid Anhui Maintenrance Company,State Grid Anhui Maintenrance Company,State Grid Anhui Maintenrance Company,State Grid Anhui Maintenrance Company,State Grid Hefei Company)
摘要
图/表
参考文献
相似文献
本文已被:浏览 508次   下载 3
投稿时间:2018-08-06    修订日期:2018-09-10
中文摘要: 安徽省某500kV新建变电站220kV部分采用组合电器,在启动送电的过程中发生绝缘击穿导致设备跳闸的故障,严重影响了正常的电力生产秩序,为了彻底查清故障并为避免组合电器类似故障提供借鉴,本文给出了绝缘击穿故障的详细经过、故障查找和原因分析,在对故障单元拆解后从内部放电痕迹、绝缘拉杆及盆式绝缘子X射线探伤、故障单元耐压和局放试验、镀银层厚度检测、装配尺寸等方面进行分析,结合内部样品粉末检测报告后查明由于在设备制造组装阶段工艺把控不严,没有将内部的金属颗粒完全清理,导致组合电器送电后发生绝缘击穿。事故暴露出组合电器制造单位未严格落实相关工艺管控要求,设备运维管单位为防止其他设备发生类似故障要求制造厂家采取相应的预防措施。
中文关键词: 组合电器  绝缘击穿  故障
Abstract:The gas insulated switchgear is used in 220kV part of a 500kV new substation in Anhui Province. In the process of starting power transmission, The insulation breakdown causes equipment tripping during the start-up and power transmission, which seriously affects the normal order of power production. In order to thoroughly identify the fault and provide reference to avoid the gas insulated switchgear similar faults, the detailed process, fault diagnosis and reason analysis of insulation breakdown fault are introduced. After disassembly analysis of the faulty unit, it is analyzed from the view of internal discharge traces, insulation rod and basin insulator X-ray inspection, fault cell withstand voltage and partial discharge test, silver layer thickness detection, equipment size. Combining with internal sample powder test report, it is found out that the process control of the equipment manufacturing and assembly stage is not executed strictly, and metal particles inside are not completely cleaned, resulting in insulation breakdown after the device is powered. It is exposed that the gas insulated switchgear manufacturer do not strictly implement the relevant process control requirements, and the equipment operation and maintenance management unit required the manufacturer to take corresponding preventive measures to prevent similar failures of other equipment.