中文摘要: 山区农村产业和生活用电快速增长,同时受到季节性负荷和人口迁移的影响,低电压问题较为普遍,在局部时间点尤为突出,采用传统的交流台区改造方式在投入与效益之间极难取得平衡。针对这一问题,考虑采用交直流串联、并联两种电网改造方式,治理远距离供电台区的低电压问题。首先,本文介绍了台区改造前的基本情况,梳理了传统改造方案存在的问题;其次,从示范涉及的建设方案、变流设备以及设备现场安装情况三个方面,对两种交直流示范工程方案进行了介绍;此外,分析实验室测试数据以及现场应用情况,验证了两种交直流示范工程方案的有效性。最后,对示范区改造的效果和未来发展方向进行了总结。
Abstract:With the rapid growth of industrial and residential electricity consumption in rural and mountainous areas, under-voltage issues are becoming significant and particularly prominent in some periods due to seasonal load and population migration. It is extremely difficult to achieve a balance between input and benefit when considering adopting traditional transformation measures to solve the above problems. Therefore, two types of grid transformation measures, AC-DC series/parallel connection, are proposed to solve under-voltage issues owing to excessive power supply distance. Firstly, this paper introduces basic situations of two low-voltage distribution networks (LVDNs) before the two-type transformations, and analyzes the problems of the traditional transformation measures. Secondly, the two the two-type transformations of AC-DC series/parallel connection are introduced in detail from three aspects: construction scheme, converter equipment and equipment installation. Moreover, the effectiveness of the AC-DC series/parallel connection schemes is verified by analyzing the laboratory test data and applications, and the advantages and disadvantages of the two-type transformations are analyzed. Finally, the effects of the the two-type transformations and the future development direction are summarized.
keywords: distribution network in mountain areas voltage quality AC-DC distribution network series connection parallel connection demonstration project
文章编号: 中图分类号: 文献标志码:
基金项目:
作者 | 单位 | |
王峰 | 贵州大学 电气工程学院 | 2639423410@qq.com |
蔡永翔* | 贵州电网有限责任公司电力科学研究院 | lpscaiyx@163.com |
熊楠 | 贵州电网有限责任公司 | |
文贤馗 | 贵州电网有限责任公司电力科学研究院 | |
周念成 | 重庆大学电气工程学院 |